Grey corner bifold door installation

Corner bifold door installation in Muswell Hill, London

 

Enfield Windows – the bifold door experts

Enfield windows latest corner bi-fold door project was to replace the client’s old timber doors with a more modern contemporary maintenance free product.

After an initial enquiry was made via our web site, we were invited to the client’s property to discuss the product, material, colour and glazing requirements for the project.

The doors being replaced were one section of three parts. These were situated alongside a larger three and four part part set that cohesively worked as one, creating a large open corner space.

With such a vast span of glazed walling the glass specification had to be highly efficient during colder months of the year.

Pilkington Glass

Pilkington K Glass™ S is the latest high performance, low-emission soft coated product which offers excellent thermal insulation when incorporated within an Insulating Glass Unit (IGU). It has a highly neutral appearance with optimal solar heat gain, thermal insulation and light transmission to provide the highest Window Energy Rating (WER) performance.

For a door set with a span such as this and with so many moving parts the best choice for material was aluminium. With strong frames and sashes and the equally strong running gears, not only is this a great low maintenance modern material but it’s contemporary look and perfect straight lines completely enhances any area it is situated in.

After going though Origins stock choice of colours that include Slate grey, Black grey, Anthracite Grey and black or white, the slightly lighter Slate grey was chosen. Origin offer up to 200 colour combinations from the RAL colour chart.

Furniture was next area to be decided on. Originally the order placed was for black hinges and gaskets with a stainless steel handle. During the ordering process a member of our installations team called the client to suggest that colour coded gaskets and stainless hinges would be a better choice for the overall look and finish to which the customer agreed and the order was placed.

The diary was space was allocated and within three weeks of our survey the project was completed. During the first day of installation our three highly skilled installers removed and replaced all the doors! This allowed our team to spend the second day carrying out the final detailed trimming and finishing which along with installing itself is key to the overall look.

The pictures speak for themselves – a stunning the new corner and single set are a wonderful addition to the garden and completely transform the rear of the client’s property. The client was extremely happy with the service we provided and more importantly the final result.

Enfield windows currently have three dedicated Origin bi-fold door installers and our customer promise is that we are able to offer a competitive cost survey, supply and install within ten days and in many cases five days. This is something many companies are unable to achieve. Along with our skilled fitters, the product and lead time is what makes us the No.1 google ranked corner bi-fold installers in London.

 

For more advice and a free no obligation quotation please contact us. You can email over sizes and specifications and we will endeavour to have a returned fixed quotation in the same day.

 

White timber bay window closeup

Timber window installation in Winchmore Hill, north London

Enfield windows most recent installation was in Winchmore hill area of north London. We are proud to say that this was the third property within the same road in which we replaced the windows, using timber as the choice of material. This time Enfield Windows had been recommended by a previous client living next door.

We were asked to replace two large bay windows and one small front bay window with “like for like” using Hardwood Meranti timber. The project was quoted at a highly competitive rate beating our closest rival by over £1200.00 whilst still supplying the same product.

After the deposit was taken we arranged for the surveyor to visit and take accurate measurements for the order. Internal trims, windows boards and architraves were also measured to be replaced in factory finished timber.

The manufacturing process took approximately five weeks during which time we acquired the gold furniture fittings and scheduled the installation to be booked in on delivery of the frames.

The installers carried out the work over three and a half days and as the results show the new windows are another great addition, not only to the premises but also to the street.

Since the completion of this installation we have been invited to quote for works at another neighbouring property!